Divaca-Koper Railway

To Build Happiness Is Our Happiness

Divaca-Koper Railway

Kolektor CPG-Yapı Merkezi-Özaltın Consortium was awarded the 1st and 2nd  LOT of the tenders held in two parts by 2TDK Company established by the Slovenian State to implement the project for doubling the Divaca-Koper Railway, which is the largest infrastructure project of Slovenia. 
 
Within the scope of the 1st LOT of Divaca-Koper Railway, with a contract price of 403 million 613 thousand 361 Euros, tunnels with a total of 25 thousand 463 meters will be opened with the New Austrian Explosion Method. The first part of the project is planned to be completed in 40 months.
 
The contract value of Divaca-Koper Railway LOT 2 is 224.7 million Euros. Within the framework of the project, which will be completed in 36 months, the construction of 6 tunnels with lengths of 0.3 km, 2 km, 0.5 km, 1.1 km and 3.8 km (twin tunnels), together with the construction of two viaducts with 452 m and 647 m lengths, will be carried out.
 
Divaca-Koper Railway
İnternet sitemizde, çerez (cookie) kullanılmaktadır. İnternet sitemizde kullanılan çerezler (cookie) hakkında detaylı bilgi almak için www.ym.com.tr adresinde yer alan Çerez Politikasını inceleyebilirsiniz. Çerez tutulmasını istemiyorsanız Çerez ayarlarınızı dilediğiniz zaman değiştirebilirsiniz. Devam etmeniz halinde çerez (cookie) kullanımına izin verdiğinizi kabul edeceğiz.
Çerez ayarlarınızı değiştirmeniz halinde internet sitesinin birtakım özelliklerinin kullanamayabileceğinizi belirtmek isteriz.